Thursday 13 April 2017

Cooling Towers and Heat Exchangers – FRP Engineers

Construction of Cooling Towers in Pakistan is one of the biggest and most complicated work in the establishment of power plant. Energy Foundation have proposed to replace the existing HVAC system with geothermal Reversible Chillers, to save natural gas, electricity & greenhouse gas emissions.
The feasibility report was prepared on complimentary basis after signing a Memo of Understanding with Pakistan Institute of Medical Sciences, (PIMS) with the approval of Government of Pakistan for the installation of geothermal heat pumps to replace existing HVAC plants being operated on natural gas It is estimated that 6 BCF gas & 4Millions of KWH of electricity will be saved annually in addition to 35000 Tons of CO2 emissions after use of geothermal energy. Millions gallons of water will be saved which is having wasted in the cooling towers of the existing systems.
Energy Foundation have carried out preliminary survey research of geothermal energy resources available in different provinces of Pakistan & prepared a report. 

No comments:

Post a Comment